Building Information Modeling (BIM)

University of Arkansas Library Storage

For this job, General Contractor Con Real needed to coordinate the mechanical penetrations into cross laminated timber panels being pre-drilled in Austria. Ellingson Contracting was brought on under the mechanical contractor to perform BIM coordination with five different subcontractors, directing modeling changes for systems in less then two weeks to meet the fabrication deadline for the panel fabricator.

Outreach Center

Outreach Center church was considering the conversion of an existing warehouse into sanctuary space. Ellingson Contracting modeled the buildout, helping the Outreach Center team visualize the new space and informing the decision-making process with real-time costs and design.

PO Box 7202, Siloam Springs, AR 72761  |  LIC #0324340318  |  info@ellingsoncontracting.com |  479.215.6889

  • Facebook Black Round

© 2017 by Mariah Christ Design. Template by wix.com