EMC Development

This design/build project for EMC Development involved creating a building for leasing opportunities in downtown Bentonville, AR.

Ellingson Contracting worked with the design team for this new construction, which included Height-Jackson and Associates, Gray Rock Civil Engineering, and GA Engineer. The building was an open space for future tenants to build out as needed.

Ellingson Contracting also helped with rezoning the location with the city to give the owner flexibility regarding parking, the size of the building, and further growth.

This building, finished in 2019, featured an entry courtyard trellis, an exterior railed porch, and three textures of exterior finishing, including aluminum wood-tone siding, a hardy board system, and brick.